Top 30 Project Management Masters Programs in 2022

Masters in Project Management will give you the theoretical background and practical knowledge and skills you need to succeed in your career and meet challenges in the industry.
Project management is the discipline of initiating, planning, executing, controlling, and closing the work of a team to achieve specific goals and meet specific success criteria at the specified time. Project managers can have the responsibility of the planning, execution, controlling, and closing of any project typically relating to the construction industry, engineering, architecture, computing, and telecommunications.
Key project management responsibilities include creating clear and attainable project objectives, building the project requirements, and managing the triple constraint, now including more constraints and calling it competing constraints for projects, which is cost, time, and scope for the first three but about three additional ones in current project management.
Top Project Management Masters Programs: New York University, School of Professional Studies, MS in Project Management, Boston University Metropolitan College, Master of Science in Project Management, University of Connecticut, MS in Business Analytics and Project Management, George Washington School of Business,Master of Science in Project Management, University of California, Berkeley, Masters in Engineering and Project Management, Northeastern University, Master of Science in Project Management, University of Alaska Anchorage, MS in Project Management, Saint Mary’s University of Minnesota, Master of Science in Project Management, Davenport University, Master of Science in Technology Management, University of Michigan-Dearborn, Master of Science in Program and Project Management, Harrisburg University of Science and Technology, Master of Science in Project Management, DeVry University, Master’s in Project Management, The University of Texas at Dallas, Master of Science in Management Science (Project Management), Northwestern University, Robert R. McCormick School of Engineering, Master of Project Management, University of Houston, Master of Science in Technology Project Management, Iona College, Hagan School of Business, MS in Project Management, Lewis University, Master of Science in Project Management, Virginia International University, School of Business, Master of Science in Project Management, Regis University, Master of Science in Project Leadership and Management, Stevens Institute of Technology, Masters in Enterprise Project Management, City University of Seattle, School of Management, MS in Project Management, DePaul University, Master of Science in IT Project Management, Florida Institute of Technology, Master of Science in Project Management, Bellevue University, Master of Project Management, The Citadel – The Military College of South Carolina, Master of Science in Project Management, Colorado Technical University, Master of Science in Management – Project Management, University of Mary, Master of Project Management, Lasell College, MS in Management (Project Management), Robert Morris University, Master of Science in IT Project Management, New England College, Master of Science in Engineering Project Management are some of the Top Project Management Masters Programs.
You may also like to review Top Project Management Masters Programs Online and What you need to know about Project Management Masters in the US.

Top Project Management Masters Program
Top Project Management Masters Programs 2022
New York University, School of Professional Studies, MS in Project Management
The MS in Project Management offered by the NYU School of Professional Studies is a 36-credit program grounded in the best practices, principles, and methodologies of this specialized area of expertise. The program's curriculum provides a comprehensive, rigorous educational experience that focuses on leading practices, principles, and methodologies associated with the project management science. It integrates management and leadership skills with the business and technical know-how required to manage projects across a wide range of industries. The curriculum comprises extensive content in areas such as quality, communications, project operations, organizational leadership, business ethics, risk management, contracts, project initiation, planning, financial…
New York University, School of Professional Studies, MS in Project Management

Boston University Metropolitan College, Master of Science in Project Management
The Master of Science in Project Management degree program (MSPM) at Boston University’s Metropolitan College teaches the tools and techniques required to monitor and track project costs and schedule. It also helps students develop the ability to manage project resources and communications, and complete a successful project. The program is instructed by faculty members who are highly regarded for their academic accomplishments and hands-on industry experience. They bring insightful, real-world knowledge to the classroom. Furthermore, you’ll benefit from the diverse perspectives of your classmates, who comprise working professionals, full-time students, and international scholars. The MS in Project Management is available…
Boston University Metropolitan College, Master of Science in Project Management

University of Connecticut, MS in Business Analytics and Project Management
The University of Connecticut’s MS in Business Analytics & Project Management degree provides you with the project management knowledge, tools, and techniques you need to effectively plan, organize, and deliver projects and programs. Learning in the program comprises a combination of lectures, class discussions, and presentations to peers. The curriculum is covered in 37 credit hours, including five 3-credit courses in Business Analytics, 1 credit in technical communications, four 3-credit courses in Project Management, and 9 credit hours in elective courses. Elective courses can be chosen from the wide array of offerings in the School’s professional MBA program, and may…
University of Connecticut, MS in Business Analytics and Project Management

George Washington School of Business,Master of Science in Project Management
The George Washington School of Business’ Master of Science in Project Management is a highly specialized program applicable to all industries. Admission to the MSPM program is competitive. Applicants must present a bachelor’s degree from a regionally accredited college or university and also meet the minimum requirements. The MS in Project Management program aligns itself with the Project Management Institute’s PMBOK standards. Students will cover such topics as planning, scheduling, risk management, and cost estimation, and also learn project portfolio management and executive decision making. It is instructed by distinguished industry experts who bring realistic examples from the workplace to…
George Washington School of Business,Master of Science in Project Management

University of California, Berkeley, Masters in Engineering and Project Management
The UC Berkeley's Masters in Engineering and Project Management (E&PM) degree program prepares professionals to become leaders in managing projects and companies in Architecture-Engineering-Construction (AEC), as well as other industries. The program places emphasis on teaching and researching new management technologies, developments, techniques, and such concepts as Lean Construction, Cost and Schedule Forensics, and Sustainability Engineering. The Program emphasizes the interrelationships of all project life-cycle components: planning, design, manufacturing, construction, operation, maintenance, and re-purposing/decommissioning. The program is strongly interlinked with industry as the campus is located in the San Francisco Bay Area—the center of major local, national, and international project…
University of California, Berkeley, Masters in Engineering and Project Management

Northeastern University, Master of Science in Project Management
The Northeastern University’s Master of Science in Project Management is designed to help you obtain and learn the practical skills and theoretical concepts needed to lead complex projects. This Project Management degree incorporates real-world case studies as well as techniques and tools for managing long- and short-term projects, in order to complete projects successfully and cost effectively. The program’s comprehensive and articulate curriculum covers such topics as project definition, cost and risk estimation, schedule planning and monitoring, budget management, negotiation and conflict resolution, project leadership, and project presentation and evaluation. To earn the MSPM degree, students take on 8 required…
Northeastern University, Master of Science in Project Management

University of Alaska Anchorage, MS in Project Management
The Master of Science in Project Management offered at University of Alaska Anchorage is designed for working professionals and helps them develop a high-demand skill-set valued in both private and public sectors, and across all industries. Courses are taught by a team of established faculty members and instructors who bring extensive academic and professional experience to each course. Courses are delivered in the traditional classroom and/or online through state-of-the-art, real-time video capabilities. The online format allows students from across the state and around the world to join local students and faculty in the classroom in real time. This real-time capability…
University of Alaska Anchorage, MS in Project Management

Saint Mary’s University of Minnesota, Master of Science in Project Management
The Master of Science in Project Management offered at Saint Mary's University of Minnesota is designed to provide you with the skills and knowledge you need to lead complex projects across a variety of industries and positions. At Saint Mary's, you'll learn alongside equally motivated peers and from industry professionals who incorporate real-world examples in their delivery. This educational approach gives you the confidence and capability to immediately apply what you learn in your coursework directly into your workplace. To earn the Master of Science in Project Management degree, you must complete a total of 36 credits including: 9 credits…
Saint Mary’s University of Minnesota, Master of Science in Project Management

Davenport University, Master of Science in Technology Management
The Davenport University’s Master of Science in Technology Management program features a high quality, interdisciplinary technical and business graduate curriculum in technology management. The program is designed to prepare graduates for a life-long career addressing critical leadership roles in private, public or government organizations. It combines a set of business and technical competencies to give graduates the competitive advantages needed to lead information technology departments in the global economy. Applicants to the program are expected to have necessary undergraduate preparation in information systems security, statistics, and business foundations. Otherwise, you will be required to complete graduate foundational courses or undergraduate…
Davenport University, Master of Science in Technology Management

University of Michigan-Dearborn, Master of Science in Program and Project Management
The Master of Science in Program and Project Management offered at the University of Michigan-Dearborn is designed for technical professionals from various industries, who need to deepen their understanding of program and project management. This program is also ideal for professionals who want to enhance their ability to coordinate complex projects, motivate and manage people, and achieve cost-effective outcomes. The program was developed in response to an increasing demand for skilled and experienced professionals who can develop, deploy, and manage locally and globally developed programs in a timely and efficient manner. The graduate program draws upon the expertise of the…
University of Michigan-Dearborn, Master of Science in Program and Project Management

Harrisburg University of Science and Technology, Master of Science in Project Management
The Master of Science in Project Management degree offered at the Harrisburg University of Science and Technology provides students with the technical, project management and leadership skills needed for career advancement in the field of project management. The program incorporates innovative academic and experiential learning opportunities that enable students to understand, apply, analyze, synthesize, and evaluate projects, teams and leaders in enterprise environments. The program comprises a total of 36 credit hours. This includes an Agile Lean concentration that requires a total of 4 Agile Lean Courses. Through this concentration students will gain a deep understanding of Agile Lean frameworks…
Harrisburg University of Science and Technology, Master of Science in Project Management

DeVry University, Master’s in Project Management
The Master’s in Project Management offered at DeVry University’s Keller Graduate School of Management is designed to help students develop the skills required to solve real-world management problems, and to exercise the right decisions through practical application of Project Management concepts. The program is instructed by industry professionals who keep the curriculum relevant helping you meet evolving market place demands. To earn the MPM degree, students are required to complete 39 semester-credit hours. The program’s coursework addresses such topics as cost management, quality control, planning and improvement. Assignments and projects focus on organizing, implementing and controlling business activities; achieving schedule,…
DeVry University, Master’s in Project Management

The University of Texas at Dallas, Master of Science in Management Science (Project Management)
The program curriculum of UT Dallas MS in Management Science with an emphasis in Project Management combines both technical aspects and critical human skills to provide comprehensive training in project and program management. Admission to the program is highly selective to ensure that high standards are maintained in a cohort class. Candidates are evaluated on criteria that include prior academic and professional accomplishments, serious commitment and leadership skills. To earn the degree with an emphasis in project management, students are required to complete a Project Management Core comprised of 20 semester credit hours and an additional 19 semester credit hours…
The University of Texas at Dallas, Master of Science in Management Science (Project Management)

Northwestern University, Robert R. McCormick School of Engineering, Master of Project Management
The Northwestern University Master of Project Management (MPM) program is designed to prepare technically qualified individuals for leadership roles in the construction, operation, and management of major civil and environmental engineering projects. The program’s curriculum combines education in essential concepts of civil and architectural engineering design with the functional concepts of business management and behavioral science. This approach to learning, along with the expertise of renowned faculty practitioners, contributes in producing graduates who are capable of directing all aspects of complex civil engineering projects. To earn the Master of Science in Project Management degree, you will have to take a…
Northwestern University, Robert R. McCormick School of Engineering, Master of Project Management

University of Houston, Master of Science in Technology Project Management
The University of Houston’s Master of Science in Technology Project Management is designed specifically to prepare individuals with undergraduate degrees in technology disciplines for responsible leadership roles in technology-based professional workplaces. The program’s core courses provide in-depth preparation in project management skills, which will play a key role in the planning and management of technology projects. There are four required courses (12 credit hours): Project Management Principles; Project Leadership and Team Building; Risk Assessment in Project Management; and Quality Improvement in Project Management. The program also features a directed area of study which involves 12 credit hours of advanced graduate…
University of Houston, Master of Science in Technology Project Management

Iona College, Hagan School of Business, MS in Project Management
The Iona College Master of Science in Project Management offered at the Hagan Business School is designed to provide today’s project managers with the tools and skills they need to balance the complexities of managing modern projects of any type or size, and in any industry. One such skill is the ability to identify business value, risk, quality, safety, cost, finance and technology. The School produces graduates and future leaders, who understand business and its social responsibilities, work productively in a high-technology and culturally diverse societies, demonstrate awareness of the global character of business, and subscribe to high ethical standards.…
Iona College, Hagan School of Business, MS in Project Management

Lewis University, Master of Science in Project Management
The Lewis University’s Master of Science in Project Management degree is a specialized program designed to provide professionals with skills in management, communication, and leadership, so they can manage complex projects and teams in achieving strategic organizational goals. The program’s curriculum focuses on strategies for maximizing and coordinating human and operational resources, budgeting, scheduling, and scope management. To earn the Master of Science in Project Management degree, students must complete the program’s 36 graduate credits. This includes 11 courses and 3 professional seminars, which are offered in five 8-week sessions per year (2 sessions in the fall semester, 2 sessions…
Lewis University, Master of Science in Project Management

Virginia International University, School of Business, Master of Science in Project Management
The Master of Science in Project Management (MPM) degree program offered by the School of Business at Virginia International University provides students with the technical and operational skills necessary to excel in leadership positions as project managers. The School is an Educational Member of the International Assembly for Collegiate Business Education (IACBE), and has affirmed its commitment to excellence in business education. Courses in the MPM program emphasize project progressive elaboration strategies as well as application theory used to monitor and control all that pertains to a project with the ultimate goal of achieving project objectives on-time and within budget.…
Virginia International University, School of Business, Master of Science in Project Management

Regis University, Master of Science in Project Leadership and Management
The Master of Science in Project Leadership and Management offered at Regis University’s College of Business and Economics features an intensive, accelerated and integrated learning experience. The program is focused on and aligned with the Project Management Institute’s Talent Triangle of Technical Skills, Strategic Management and Leadership. It is also accredited by the Global Accreditation Center for Project Management Education (GAC). The program provides preparation for strategic project management leadership in a rapidly changing, global marketplace. The program is designed for professionals who wish to enhance their leadership skills to make a profound impact in their organizations. With an M.S.…
Regis University, Master of Science in Project Leadership and Management

Stevens Institute of Technology, Masters in Enterprise Project Management
The Stevens Master's degree in Enterprise Project Management features a unique curriculum that emphasizes on business, technical and leadership skills to advance a strategic perspective that’s crucial to modern project management. The program prepares forward-thinking leaders through courses in strategic perspectives, project planning, project portfolio management and cross-project leadership. This transforms students into effective project managers who can direct complex, enterprise-level initiatives on time and on budget. The university is a registered education provider with the Project Management Institute. Therefore, courses in the degree program meet the demanding standards of PMI, and incorporate both project management expertise and leadership development.…
Stevens Institute of Technology, Masters in Enterprise Project Management

City University of Seattle, School of Management, MS in Project Management
City University of Seattle’s Master of Science in Project Management degree program is designed to provide the skills, knowledge, and insights required to manage projects and programs in a variety of business applications and industries. The program is recommended for anyone with an undergraduate degree who wishes to aid organizations in realizing opportunities to grow their business. It offers tangible and practical skills relevant to project management. Specifically, the program helps develop the skills students need for leadership of project focused activities in an organizational setting. This includes building a project portfolio based on organizational strategy, and then developing and…
City University of Seattle, School of Management, MS in Project Management

DePaul University, Master of Science in IT Project Management
The DePaul University Master of Science in IT Project Management provides students with the skills and acumen necessary for a career in managing all aspects of Information Technology projects as well as the other larger programs. The program is designed for working professionals who possess a Bachelor's degree or significant work experience in an IT related area. Students whose undergraduate degree is in an unrelated area will be required to produce evidence of at least two years of responsible work experience in an IT-related field. Students gain experience with the latest methodologies such as Agile Project Management, project portfolio management,…
DePaul University, Master of Science in IT Project Management

Florida Institute of Technology, Master of Science in Project Management
The Florida Institute of Technology’s Master's in project management is designed for professionals from diverse backgrounds seeking to obtain advanced leadership positions in either private or public organizations. The program helps develop skills and competencies in project management and in identified concentration areas such as operations research, information systems, or other areas of interest selected by the student. Because project management has become a business strategy of choice, graduates are empowered to become dynamic and effective project managers, who are ready to assume the responsibility for improving business performance. The program is instructed by professors who possess doctorate degrees in…
Florida Institute of Technology, Master of Science in Project Management

Bellevue University, Master of Project Management
The Bellevue University Master of Project Management (MPM) degree is an advanced professional program designed for professionals who wish to develop or expand their project management skills for interdisciplinary application. It is designed to deliver a transformative student learning experience that is flexible enough to accommodate your personal and work life. The program combines theory with active learning to provide a strong foundation of the business, communication, and leadership skills needed to plan, execute, and manage projects and portfolios in today's competitive and global environments. The program’s applied learning approach offers you the benefits of integrating business scenarios and simulations…
Bellevue University, Master of Project Management

The Citadel – The Military College of South Carolina, Master of Science in Project Management
The Master of Science in Project Management (MSPM) program offered at The Citadel - The Military College of South Carolina – features a 30-hr curriculum, which focuses on personal and organizational effectiveness, principled leadership, innovative analytical procedures and solutions to emerging technical resource issues. The program provides an advanced project management education tailored for working professionals to enable them manage and lead their organizations in project implementation and team-based, multi-disciplinary initiatives. The program contains two core curriculum modules made up of 4 technical project management courses, 2 principled leadership courses, and a number of emphasis tracks in a student's area…
The Citadel – The Military College of South Carolina, Master of Science in Project Management

Colorado Technical University, Master of Science in Management – Project Management
The Colorado Technical University’s Master of Science in Management with a concentration in Project Management (MSM-PM) program will provide you with the skills and knowledge needed to become an effective project manager. The program covers such topics as: time/conflict management; teams and HR management; risk analysis and management; scheduling techniques; organizations and processes; cost, budgeting and scheduling; procurement and contracting; and control systems implementation. The program is accredited by the PMI Global Accreditation Center for Project Management Education Programs (GAC). Content in the program revolves around key areas contained in the Project Management Body of Knowledge (PMBOK), which is considered…
Colorado Technical University, Master of Science in Management – Project Management

University of Mary, Master of Project Management
The Master of Project Management (MPM) degree program offered at the University of Mary will help you obtain the skillset needed to become a successful project manager in any industry. The curriculum is designed to provide you with the knowledge, resources and skills necessary to execute projects on time and within budget. Additionally, you will enhance your communication skills and learn team building and leadership skills essential to a wide range of professional careers. The program is offered on-site, online, and as a blended program that includes both online and on-site evening classes. This enables you to balance family, work,…
University of Mary, Master of Project Management

Lasell College, MS in Management (Project Management)
The Project Management degree at Lassell College is offered as a concentration in the Master of Science in Management program. Lasell’s Project Management concentration provides students with an understanding of today’s rapidly evolving economy and a growing emphasis on team-oriented, project-focused workplaces, giving them a solid advantage in an increasingly vital field. It instills in graduates the core skills required to create, define, and complete complex projects, including strong communication, business strategy, and organizational theory. Classes are capped at 23 students, ensuring a highly collaborative learning environment and committed faculty, who bring rich experience as working professionals to the classroom.…
Lasell College, MS in Management (Project Management)

Robert Morris University, Master of Science in IT Project Management
The Master of Science (M.S.) in Information Technology Project Management program offered at Robert Morris University is designed for IT professionals and practitioners who either work in or plan to work in a project-oriented environment. Applicants with an academic background IT are preferred but students who have not completed a specific course in IT may be admitted provisionally, and will be required to complete the course during the first semester of enrollment at RMU. Most undergraduate and graduate programs in project management in the United States focus tightly on issues relating to scheduling and resource management for military and construction…
Robert Morris University, Master of Science in IT Project Management

New England College, Master of Science in Engineering Project Management
New England College’s Master of Science in Engineering Project Management provides engineering professionals with essential leadership and technical skills for today’s dynamic global environment. The program’s curriculum is designed so that engineers can leverage technical skills learned both in school and on the job. The program will transform you into a leader who can manage projects based upon your understanding of organizational dynamics, the process of managing people, strategic management, and financial and accounting skills. A Bachelor’s degree in Engineering is a pre-requisite when applying for admission. The 40-credit program can be completed in a year for those taking it…
New England College, Master of Science in Engineering Project Management

What is Masters in Project Management?
Masters in Project Management will give you the theoretical background and practical knowledge and skills you need to succeed in your career and meet challenges in the industry.Project management is the discipline of initiating, planning, executing, controlling, and closing the work of a team to achieve specific goals and meet specific success criteria at the specified time.
What are the Top Project Management Masters Programs?
New York University, School of Professional Studies, MS in Project Management, Boston University Metropolitan College, Master of Science in Project Management, University of Connecticut, MS in Business Analytics and Project Management, George Washington School of Business,Master of Science in Project Management, University of California, Berkeley, Masters in Engineering and Project Management, Northeastern University, Master of Science in Project Management, University of Alaska Anchorage, MS in Project Management, Saint Mary’s University of Minnesota, Master of Science in Project Management, Davenport University, Master of Science in Technology Management, University of Michigan-Dearborn, Master of Science in Program and Project Management, Harrisburg University of Science and Technology, Master of Science in Project Management, DeVry University, Master’s in Project Management, The University of Texas at Dallas, Master of Science in Management Science (Project Management), Northwestern University, Robert R. McCormick School of Engineering, Master of Project Management, University of Houston, Master of Science in Technology Project Management, Iona College, Hagan School of Business, MS in Project Management, Lewis University, Master of Science in Project Management, Virginia International University, School of Business, Master of Science in Project Management, Regis University, Master of Science in Project Leadership and Management, Stevens Institute of Technology, Masters in Enterprise Project Management, City University of Seattle, School of Management, MS in Project Management, DePaul University, Master of Science in IT Project Management, Florida Institute of Technology, Master of Science in Project Management, Bellevue University, Master of Project Management, The Citadel – The Military College of South Carolina, Master of Science in Project Management, Colorado Technical University, Master of Science in Management – Project Management, University of Mary, Master of Project Management, Lasell College, MS in Management (Project Management), Robert Morris University, Master of Science in IT Project Management, New England College, Master of Science in Engineering Project Management are some of the Top Project Management Masters Programs.